N5JLD dot NET

What I do in my Spare Time

User Tools

Site Tools


ham:station:layout

Station Grounding, Bonding & Block Diagram

Last Updated: YYYY-MM-DD Primary Objective: Document lightning protection, single-point ground bonding, and RF/AC interconnect paths for safety, maintenance, and insurance records.

Station Block Diagram

Replace or supplement this ASCII diagram with an exported image (PNG/SVG) from Draw.io, KiCad, or Inkscape uploaded via the Media Manager.

Station Block Diagram

[ Antennas ]
     │
     ▼ (Coax Feedlines: LMR-400)
[ Outdoor Entry Panel ] ───► ( #6 AWG Solid Cu ) ───► [ Entrance Ground Rod ]
     │  (PolyPhaser Arrestors)                                 │
     ▼                                                         │ ( #2 AWG Buried Bond )
[ Shack Coax Switch / Patch Panel ]                            ▼
     │                                               [ Utility AC Service Ground ]
     ├──► [ HF Transceiver ] ◄───► [ Tuner / Amp ]
     │           │                       │
     │           ▼ (1" Tinned Copper Braid)
     └──► [ Shack Single-Point Ground Busbar ] ◄─── [ 12V DC Power Supply ]

Outdoor Grounding & Lightning Protection

Component Specification / Model Location & Notes
Coax Entry Panel e.g., KF7P 8×8 Aluminum NEMA Box Exterior wall, 2 ft above grade, adjacent to shack
Lightning Arrestors e.g., PolyPhaser IS-50UX-C0 (HF/VHF) Mounted directly to grounded bulkhead plate inside entry box
Entrance Ground Rod e.g., 8 ft x 5/8“ Copper-Clad Steel Driven 2 ft from foundation directly below entry panel
Inter-System Bond e.g., #2 AWG Bare Solid Copper Buried 12” deep; bonds entrance rod to main house AC ground rod
Disconnect Procedure Manual disconnect + shorting plugs Coax jumpers disconnected from shack bulkhead during severe storms

Indoor Single-Point Ground (SPG) & RF Bonding

All chassis grounds are bonded to a central copper busbar behind the operating desk to prevent ground loops and minimize shack RFI.

Equipment / Chassis Bonding Conductor Connection Point
Shack Ground Busbar 1/4“ x 2” x 18“ C110 Copper Bar Mounted to rear of desk on standoff insulators; tied to entry panel via #4 AWG
HF Transceiver 1” Tinned Flat Copper Braid (18“) Rear chassis GND lug ──► Shack Busbar
Antenna Tuner / Amp 1” Tinned Flat Copper Braid (24“) Rear chassis GND lug ──► Shack Busbar
12V DC Power Supply #10 AWG Green Stranded Wire Chassis ground screw ──► Shack Busbar (DC negative floating)
AC Surge Protection e.g., Tripp Lite Isobar Ultra Plugged into dedicated 20A shack breaker; feeds radio PSU & PC
Common-Mode Chokes e.g., Fair-Rite Type 31 Toroid (12 turns) Installed at coax entry to shack and on USB/CAT control cables

Maintenance & Inspection Log

Regular checks ensure outdoor connections remain tight and corrosion-free.

Date Inspection Item Findings & Action Taken
YYYY-MM-DD Exterior Cadweld / Clamp Joints Inspected clamps at entrance rod; applied Noalox anti-oxidant compound.
YYYY-MM-DD Arrestor Gas Discharge Tubes Verified continuity and DC blocking on PolyPhaser units; all nominal.
YYYY-MM-DD Indoor Busbar Torque Check Checked all brass hardware on shack copper busbar; tightened 2 lugs.
ham/station/layout.txt · Last modified: by N5JLD