Before traveling to the operational site, the RPIC or Equipment Technician must verify hardware readiness and firmware stability.
This physical and system inspection must be executed sequentially before every flight or battery swap.
Follow manufacturer interval guidelines or the baseline schedule below (whichever comes first) and record all maintenance in the aircraft's permanent Maintenance Logbook.
| Component | Inspection Interval | Mandatory Replacement / Action |
|---|
| Propellers | Before every flight | Replace every 50–100 flight hours, after any hard landing/strike, or immediately upon visible wear |
| LiPo / LiHV Flight Batteries | Before & after every flight | Retire at 200 charge cycles, if capacity drops below 80%, or immediately if swelling/damage occurs |
| Brushless Motors | Every 25 flight hours | Clean dust with compressed air; replace if bearings grind, overheat, or develop shaft play |
| Gimbal Dampers & Ribbon Cables | Every 25 flight hours | Replace rubber dampers every 100 flight hours or if torn/stretched |
| Airframe & Folding Hinges | Every 50 flight hours | Tighten structural fasteners; replace worn arm hinges or cracked shell sections |
| IMU & Vision Sensors | Every 100 flight hours | Run full factory sensor calibration via manufacturer assistant software |
Lithium-Polymer batteries pose a severe fire risk if mishandled. All crew members must strictly observe these rules: